Skip to content
Agentic Ag

Get a fresh weigh in before drafting for a booked kill

A list built on month-old weights puts the wrong animals on the truck: the ones that have grown past the top of the grid go and get docked, and some that now fit stay home. One weigh the week before can save the penalty.

The Drafting planner works out how far the weights could have moved, shows which animals sit near the edges of the grid and asks for a weigh before it builds the list.

When · Scheduled
Five days before a booked kill, when the mob’s last weights are more than 3 weeks old
You get
Animals near the spec edges; suggested weigh day; drafting list on fresh weights, or clearly marked stale if you skip the weigh
Approval level
Recommend. Suggests an action. You do it. You can change it.
Useful for
BeefSheepFeedlots

What it reads

  • Last weigh date and weights by tag
  • Growth rate between the last two weighings
  • Buyer’s spec: weight and fat range
  • Kill booking date

What you get

  • How many animals sit close to a grid edge
  • A suggested weigh day before the truck
  • A drafting list on fresh weights, or one marked stale if you skip it

When it stops and asks you

  • There’s no time to weigh before the truck
  • Growth since the last weigh is unknown
  • The buyer’s spec has changed since the booking

How often

Before every booked kill or sale

Who uses it

ManagersFarm staff

On other farms

  • Sheep: Lambs move through a carcase range faster, so it uses a tighter band either side of the range and a shorter stale limit.

What it uses

Live

Scales and EID readers

Weigh sessions and electronic ID (EID) tag reads go straight into the animal record.

Live

SMS and voice notes

Text the team, send a voice note or a photo, or forward a message. There’s no new app to learn.

Partner

Optiweigh

Walk-over weights would come in every day, so the team tracks mob weight and daily gain without a muster.

The last one makes it better, but it works without it.

Nothing official leaves the farm without your yes.This job runs at Recommend: suggests an action. You do it. You can change that any time.

See the guardrails

The conversation

How the job plays out, step by step.

Drafting planner

Started 6:00am · Scheduled

Start to done
8 min
Agent actions
5
Needed you
2×
[AGENT NAME]For the Drafting planner

On schedule · 6:00am

60 steers booked with [processor] on [date]; last weighed 26 days ago

Drafting planner

Projected each steer to kill day and checked him against the grid

Last weights are 26 days old. At 1.1 kg a day, 17 of the 60 are near the top or bottom of [processor]’s range and could have changed lines. Can you run them over the scales Monday? I’ll build the list that night.

[AGENT NAME] · 6:00am

Approved

Monday’s fine. First thing.

You · 6:02am

Drafting planner

Read Monday’s weights and built the list

Fresh weights are in. 51 fit the grid, 6 are now over the top and 3 are still light. Off the old weights, 4 of those heavy ones would have gone on the truck.

[AGENT NAME] · 6:02am

Print it and I’ll take it down.

Staff · 6:07am

Done · 6:08am1 waiting for you

  • How many animals sit close to a grid edgeSaved
  • A suggested weigh day before the truckSaved
  • A drafting list on fresh weights, or one marked stale if you skip itWaiting for you

Behind the scenes

  1. 6:00am

    Trigger On schedule

    60 steers booked with [processor] on [date]; last weighed 26 days ago

  2. 6:00am+13 sec

    Drafting planner works on it · 3 steps

    Projected each steer to kill day and checked him against the grid

    • scales.read_latest60 head weighed [date]
    • specs.read_buyer[processor], [weight range] cwt
    • 1.1 kg/day between the last two weighings
  3. 6:00am+2 sec

    [AGENT NAME] asks for your yes

    “Last weights are 26 days old. At 1.1 kg a day, 17 of the 60 are near the top or bottom of [processor]’s range and could have changed lines. Can you run them over the scales Monday? I’ll build the list that night.”

  4. 6:02am+3 min

    You approve

    “Monday’s fine. First thing.”

  5. 6:02am+10 sec

    Drafting planner works on it · 2 steps

    Read Monday’s weights and built the list

    • scales.read_latest60 head weighed [date]
    • drafting.build_list51 fit, 6 over, 3 under
  6. 6:02am+2 sec

    [AGENT NAME] messages you

    “Fresh weights are in. 51 fit the grid, 6 are now over the top and 3 are still light. Off the old weights, 4 of those heavy ones would have gone on the truck.”

  7. 6:07am+5 min

    Staff replies

    “Print it and I’ll take it down.”

  8. 6:08am+3 sec

    Drafting planner Done

    Drafting list on Monday’s weights, sorted by tag; 6 heavies and 3 lights listed to stay; PDF ready for the yards

    • docs.export_pdfdrafting list, [date]

An example with made-up data. Names and figures in [brackets] are placeholders.

The agent behind it

Drafting plannerMarkets & sales

The Drafting planner works out who goes where on yard day: which animals make the grid, which stay, which go to another buyer.

What it won’t do

  • Draft on weights it knows are out of date without saying so
  • Change the spec on its own; it asks you or the buyer

More jobs the Drafting planner does.

Put [AGENT NAME] to work on your farm.

We’re taking a small number of pilot farms in [REGION]. Start with one or two agents and add more as you go.

Pilot farms wanted

Want to try it out?

Join the pilot, or book a demo and we’ll walk you through this job on a farm like yours. You text the team from your phone. Some connections are still being built, and we’ll tell you which.

  • Scales and EID readers
  • SMS and voice notes
  • Optiweigh
  • Nothing to install

Free report

Getting started with AI.

A free practical guide for Australian farms and agribusinesses

Where AI actually helps on a farm, what it needs from you, the risks to watch, and a 90-day plan to start small.

  • Where it actually helps
  • What it needs from you
  • Risks and guardrails
  • Working out the return
Book a demoJoin the pilot