Flag packed fruit sitting too long in the coolroom
When orders slow, the newest pallets go out the front and the old ones get pushed to the back of the room. By the time someone finds them they’ve lost shelf life the buyer was paying for, or they fail at the buyer’s distribution centre (DC).
The Packhouse coordinator checks packed stock by pack date against the limit for each product, matches the oldest pallets to open orders and lists what should go out first.
- When · Daily
- Packed pallets in the coolroom pass the days-in-store limit you’ve set for the line
- You get
- Aged pallets by product and pack date; the orders they could fill; a dispatch-first list for the floor
- Approval level
- Act with approval. Prepares it fully. You tap yes. You can change it.
- Useful for
- Orchards and vinesMarket gardens
What it reads
- Coolroom stock list: pallet tags, product, pack date, room
- Days-in-store limit for each product
- Open orders and dispatch dates
- Pallet rejections from the last month
What you get
- A list of pallets over or near the limit, oldest first
- Which open orders each one could fill
- A dispatch-first job for the floor supervisor
When it stops and asks you
- An aged pallet’s product doesn’t match any open order
- The stock list and the room tally don’t agree
- A pallet is on QA hold
How often
Daily in the packing season
Who uses it
ManagersFarm staff
On other farms
- Market gardens: Leafy lines like lettuce and herbs get a limit in days not weeks, so it checks every morning before orders go out.
What it uses
Photos, PDFs and spreadsheets
Send in scale exports, scan results, soil tests, old spreadsheets or a photo of the shed whiteboard, and they become records.
SMS and voice notes
Text the team, send a voice note or a photo, or forward a message. There’s no new app to learn.
Google Sheets
If we get access, you’d keep using the spreadsheet you already run on, and the team would read it and keep it up to date.
The last one makes it better, but it works without it.
Nothing official leaves the farm without your yes.This job runs at Act with approval: prepares it fully. You tap yes. You can change that any time.
The conversation
How the job plays out, step by step.
Packhouse coordinator
Started 5:40am · Daily
- Start to done
- 5 min
- Agent actions
- 4
- Needed you
- 2×
[AGENT NAME]For the Packhouse coordinatorDaily check · 5:40am
Morning stock check: 14 pallets of Hass in Room 3 packed 9 days ago; limit set at 7

Packhouse coordinator
Matched the aged pallets to open orders by size and grade

14 Hass pallets in Room 3 are at 9 days. The 9 count 20 fit tomorrow’s [buyer] order and the 5 count 18 fit Thursday’s. Tomorrow’s load is currently picked from Monday’s pack. Swap the old ones in?
[AGENT NAME] · 5:40am
Yes, but leave the two on QA hold out of it.
You · 5:42am

Packhouse coordinator
Removed the two held pallets from the list

So 7 old pallets on tomorrow’s order and 5 on Thursday’s. I’ll put a dispatch-first job on the floor list for Mere. OK?
[AGENT NAME] · 5:42am
Yep.
You · 5:45am
Done · 5:45am3 saved
- A list of pallets over or near the limit, oldest firstSaved
- Which open orders each one could fillSaved
- A dispatch-first job for the floor supervisorSaved
Behind the scenes
5:40am
Trigger Daily check
Morning stock check: 14 pallets of Hass in Room 3 packed 9 days ago; limit set at 7
inventory.readRoom 3 stock list
5:40am+13 sec
Packhouse coordinator works on it · 3 steps
Matched the aged pallets to open orders by size and grade
- Open orders: [buyer] 22 pallets count 20 to 23, dispatch tomorrow; [buyer] 10 pallets count 18, Thursday
- Aged pallets: 9 count 20, 5 count 18
records.search
5:40am+2 sec
[AGENT NAME] messages you
“14 Hass pallets in Room 3 are at 9 days. The 9 count 20 fit tomorrow’s [buyer] order and the 5 count 18 fit Thursday’s. Tomorrow’s load is currently picked from Monday’s pack. Swap the old ones in?”
5:42am+3 min
You reply
“Yes, but leave the two on QA hold out of it.”
5:42am+7 sec
Packhouse coordinator works on it · 1 step
Removed the two held pallets from the list
- QA hold: pallets 3381, 3382
5:42am+2 sec
[AGENT NAME] asks for your yes
“So 7 old pallets on tomorrow’s order and 5 on Thursday’s. I’ll put a dispatch-first job on the floor list for Mere. OK?”
5:45am+3 min
You approve
“Yep.”
5:45am+3 sec
Packhouse coordinator Done
Dispatch-first job raised for 12 aged pallets; two QA-hold pallets left aside; Room 3 aged stock noted on the daily report
An example with made-up data. Names and figures in [brackets] are placeholders.
The agent behind it
Packhouse coordinatorHorticulture & packhouseThe Packhouse coordinator follows pack-outs, grading, rejects by block and dispatch.
What it won’t do
- Change grading standards
- Promise an order the packhouse can’t fill
- Make up pack-out figures
More jobs the Packhouse coordinator does.
- Find out why a block’s pack-out droppedOn demand
- Read the daily grader report and flag rejects by blockDaily
- Check today’s orders against what’s packed before the truckScheduled
- Pull together the season’s pack-out and rejects by blockScheduled
- Pull the records when a buyer rejects a loadOn demand
- Check there are enough cartons and liners for the peak weeksScheduled
Put [AGENT NAME] to work on your farm.
We’re taking a small number of pilot farms in [REGION]. Start with one or two agents and add more as you go.
See it on a farm like yours.
30 minutes with Thomas, our founder, on records like your own.
Livestock, paddocks, visitors and tanks, in one place.
The farm management software comes with every plan. Keep the software you already use, or use ours.
Not ready yet? Start with a free calculator.
The sums you do every week, for stock, pasture, crops and the books. No sign-up.
Watch a job before you commit.
Pick a playbook and see it play out, step by step.


