Run the pre-summer fan, pad and alarm test on every shed
The first 38°C day always finds the fan with the slipping belt, the pad that’s scaled up or the alarm that dials a phone number from two staff ago. Finding it in October costs a belt; finding it in December can cost a shed.
The Shed climate watcher builds a per-shed checklist of fans, cooling pads, foggers, alarm dial-out and backup power, assigns it and follows up each item until it’s ticked off.
- When · Scheduled
- Early October, before the first hot spell
- You get
- A checklist for each shed; jobs assigned with due dates; a summary of what failed and what’s been fixed
- Approval level
- Act and tell. Does it and logs it. You hear about it after. You can change it.
What it reads
- Shed list with fan, pad and fogger counts
- Last season’s faults and repairs
- Alarm call list and last dial-out test
- Generator and backup power test records
What you get
- A checklist per shed covering every fan, pad, fogger and alarm
- Jobs assigned to staff with a due date before [date]
- A dial-out test of the alarm to the current call list
- A list of anything that failed, with who’s fixing it
When it stops and asks you
- The alarm call list has a number that isn’t on the current staff list
- A repair needs a contractor or parts
- A shed is full of birds or pigs and a test means turning cooling off
How often
Once a year, early October
Who uses it
ManagersFarm staff
On other farms
- Pigs: Includes drip coolers and sprinklers over the sows, and the fans in the farrowing rooms.
What it uses
SMS and voice notes
Text the team, send a voice note or a photo, or forward a message. There’s no new app to learn.
Nothing official leaves the farm without your yes.This job runs at Act and tell: does it and logs it. You hear about it after. You can change that any time.
The conversation
How the job plays out, step by step.
Shed climate watcher
Started 6:00am · Scheduled
- Start to done
- 6 min
- Agent actions
- 5
- Needed you
- 2×
[AGENT NAME]For the Shed climate watcherOn schedule · 6:00am
1 October: pre-summer shed test due on all 6 sheds

Shed climate watcher
Built the checklist from the shed list and last summer’s faults

Pre-summer check is due. 72 fans, 12 pad walls, foggers in Sheds 1 and 2, and the alarm dial-out. The call list still has [former staff] on it. Who should be on it now? And shall I split the fan and pad checks between [staff] and [staff] for next week?
[AGENT NAME] · 6:00am
Swap him for [name]. Split is fine.
You · 6:02am

Updated list: you, [manager], [name]. Jobs to set for Tuesday and Wednesday, with the alarm test Thursday 10am. Go ahead?
[AGENT NAME] · 6:02am
Go ahead.
You · 6:05am

Shed climate watcher
Set the jobs and tracked the results as they came back
Done · 6:05am4 saved
- A checklist per shed covering every fan, pad, fogger and alarmSaved
- Jobs assigned to staff with a due date before [date]Saved
- A dial-out test of the alarm to the current call listSaved
- A list of anything that failed, with who’s fixing itSaved
Behind the scenes
6:00am
Trigger On schedule
1 October: pre-summer shed test due on all 6 sheds
- Seasonal plan
6:00am+13 sec
Shed climate watcher works on it · 3 steps
Built the checklist from the shed list and last summer’s faults
records.search6 sheds, 72 tunnel fans, 12 pad walls- Last summer: Shed 5 fan 8 belt, Shed 2 pad pump
- Alarm call list last tested [date]; includes [former staff]
6:00am+2 sec
[AGENT NAME] messages you
“Pre-summer check is due. 72 fans, 12 pad walls, foggers in Sheds 1 and 2, and the alarm dial-out. The call list still has [former staff] on it. Who should be on it now? And shall I split the fan and pad checks between [staff] and [staff] for next week?”
6:02am+3 min
You reply
“Swap him for [name]. Split is fine.”
6:02am+2 sec
[AGENT NAME] messages you
“Updated list: you, [manager], [name]. Jobs to set for Tuesday and Wednesday, with the alarm test Thursday 10am. Go ahead?”
6:05am+3 min
You reply
“Go ahead.”
6:05am+10 sec
Shed climate watcher works on it · 2 steps
Set the jobs and tracked the results as they came back
jobs.create6 shed checklists- Results: Shed 3 fans 4 and 11 belts loose; Shed 6 pad wall scaled; alarm dialled all 3 numbers
6:05am+3 sec
Shed climate watcher Done
All 6 sheds checked; 2 belts replaced; Shed 6 pad cleaning on the job list; alarm call list updated and tested
memory.rememberalarm call listrecords.log_readingpre-summer test results
An example with made-up data. Names and figures in [brackets] are placeholders.
The agent behind it
Shed climate watcherPigs & poultryThe Shed climate watcher keeps an eye on shed temperature, ventilation and alarms.
What it won’t do
- Change the controller settings
- Ignore an alarm because it’s the middle of the night
- Make up a reading
More jobs the Shed climate watcher does.
- Act early on a hot shedDaily
- Check the generator test got doneScheduled
- Flag ammonia climbing in a shed late in the batchDaily
- Check the creep heat before a cold night in farrowingDaily
- Work out what happened with last night’s shed alarmOn demand
- Work out if a quiet tank sensor means no water in the shedDaily
Put [AGENT NAME] to work on your farm.
We’re taking a small number of pilot farms in Australia. Start with one or two agents and add more as you go.
See it on a farm like yours.
30 minutes with Thomas, our founder, on records like your own.
Livestock, paddocks, visitors and tanks, in one place.
The farm management software comes with every plan. Keep the software you already use, or use ours.
Not ready yet? Start with a free calculator.
The sums you do every week, for stock, pasture, crops and the books. No sign-up.
Watch a job before you commit.
Pick a playbook and see it play out, step by step.

