Skip to content
Agentic Ag
ScheduledAct with approvalSale day

Keep the cattle scales and feed truck calibration current

Induction weights, feed truck loads and ration records all lean on the scales being right, and an auditor can ask for the certificate. The calibration contractor books out weeks ahead in autumn, so leaving it until it lapses means weeks of weights you can’t stand behind.

The Feedlot QA clerk reads the calibration certificates in Documents, lines up every scale due in the next few months so one trip covers them and asks before putting the booking on the job list.

When · Scheduled
Six weeks before a calibration certificate for the cattle scales or a feed truck’s load cells runs out
You get
Each scale with its last calibration and due date; one job to book the calibration for all that are due; the new certificates checked against the serial numbers
Approval level
Act with approval. Prepares it fully. You tap yes. You can change it.
Useful for
Feedlots

What it reads

  • Documents: calibration certificates for the induction shed scales and the feed truck load cells
  • Machinery services: repairs to the feed trucks since the last calibration
  • Contacts: [calibration contractor]

What you get

  • Each scale and load cell with its last calibration and due date
  • One job to book [calibration contractor] for everything due, six weeks out
  • The new certificates checked for the right serial number when they come in

When it stops and asks you

  • A certificate names a different serial number from the scale in use
  • A scale was moved or repaired since its last calibration
  • The due date isn’t on the certificate

How often

Once or twice a year per scale

Who uses it

ManagersThe farm office

What it uses

Live

Photos, PDFs and spreadsheets

Send in scale exports, scan results, soil tests, old spreadsheets or a photo of the shed whiteboard, and they become records.

Nothing official leaves the farm without your yes.This job runs at Act with approval: prepares it fully. You tap yes. You can change that any time.

See the guardrails

The conversation

How the job plays out, step by step.

Feedlot QA clerk

Started 6:00am · Scheduled

Start to done
5 min
Agent actions
3
Needed you
2×
[AGENT NAME]For the Feedlot QA clerk

On schedule · 6:00am

Feed truck 2’s load cell certificate runs out [date], six weeks away

Feedlot QA clerk

Checked the other scales

Feed truck 2’s load cells are due for calibration [date], in 6 weeks. The induction shed scales are due a month after. [calibration contractor] could do both in one trip. Want a job to book them?

[AGENT NAME] · 6:00am

Yes, both. Truck 1 had a new load cell fitted in [month], does that matter?

You · 6:02am

Truck 1’s certificate is from before the new load cell, so it may not cover it. Worth asking [calibration contractor] to do truck 1 on the same trip.

[AGENT NAME] · 6:02am

One job for you to book [calibration contractor] for trucks 1 and 2 and the induction scales, the week of [date]. When the certificates come in I’ll check the serial numbers match. Add it?

[AGENT NAME] · 6:02am

Approved

Add it.

You · 6:05am

Feedlot QA clerk

Added the job

Done · 6:05am3 saved

  • Each scale and load cell with its last calibration and due dateSaved
  • One job to book [calibration contractor] for everything due, six weeks outSaved
  • The new certificates checked for the right serial number when they come inSaved

Behind the scenes

  1. 6:00am

    Trigger On schedule

    Feed truck 2’s load cell certificate runs out [date], six weeks away

    • documents.read[calibration contractor] certificate, feed truck 2 load cells, serial [number], due [date]
  2. 6:00am+10 sec

    Feedlot QA clerk works on it · 2 steps

    Checked the other scales

    • documents.readinduction shed scales, calibrated [date], due [date]
    • documents.readfeed truck 1, calibrated [date], due [date]
  3. 6:00am+2 sec

    [AGENT NAME] messages you

    “Feed truck 2’s load cells are due for calibration [date], in 6 weeks. The induction shed scales are due a month after. [calibration contractor] could do both in one trip. Want a job to book them?”

  4. 6:02am+3 min

    You reply

    “Yes, both. Truck 1 had a new load cell fitted in [month], does that matter?”

  5. 6:02am+2 sec

    [AGENT NAME] messages you

    “Truck 1’s certificate is from before the new load cell, so it may not cover it. Worth asking [calibration contractor] to do truck 1 on the same trip.”

  6. 6:02am+2 sec

    [AGENT NAME] asks for your yes

    “One job for you to book [calibration contractor] for trucks 1 and 2 and the induction scales, the week of [date]. When the certificates come in I’ll check the serial numbers match. Add it?”

  7. 6:05am+3 min

    You approve

    “Add it.”

  8. 6:05am+7 sec

    Feedlot QA clerk works on it · 1 step

    Added the job

    • jobs.create[manager], book [calibration contractor] for feed trucks 1 and 2 and the induction shed scales, week of [date]
  9. 6:05am+3 sec

    Feedlot QA clerk Done

    A job to book one calibration trip for all three; truck 1’s new load cell picked up; serial numbers to be checked when the certificates come in

An example with made-up data. Names and figures in [brackets] are placeholders.

The farm software this job works from

Put [AGENT NAME] to work on your farm.

We’re taking a small number of pilot farms in [REGION]. Start with one or two agents and add more as you go.

Pilot farms wanted

Want to try it out?

Join the pilot, or book a demo and we’ll walk you through this job on a farm like yours. You text the team from your phone. Some connections are still being built, and we’ll tell you which.

  • Photos, PDFs and spreadsheets
  • Nothing to install

Free report

Getting started with AI.

A free practical guide for Australian farms and agribusinesses

Where AI actually helps on a farm, what it needs from you, the risks to watch, and a 90-day plan to start small.

  • Where it actually helps
  • What it needs from you
  • Risks and guardrails
  • Working out the return
Book a demoJoin the pilot