Skip to content
Agentic Ag

Show what’s left to cut when rain stops the cane harvest

A wet week in the crush pushes every grower in the group back, and the blocks that should have gone next can end up standing over. You go into the group meeting with a rough idea, not the numbers to argue your case.

The Cane harvest liaison lists the blocks still to cut with their CCS (sugar content) trend and tonnes, works out how many cutting days the stoppage costs against the allocation and drafts a note for you to take to the harvest group.

When · Daily
Rain forecast or recorded that will stop harvesting for more than two days during the crush
You get
Blocks left with tonnes and CCS; cutting days lost; allocation still to fill; note drafted for the harvest group meeting
Approval level
Recommend. Suggests an action. You do it. You can change it.
Useful for
Irrigated crops

What it reads

  • Forecast rain for the next week
  • Blocks still to cut: tonnes estimate, ratoon, CCS from the last samples
  • Deliveries to date against the mill allocation
  • Harvest group round order

What you get

  • Blocks still to cut with tonnes and CCS trend
  • How many cutting days the rain is likely to cost
  • Allocation still to fill and what that means for the end of crush
  • A short note to take to the harvest group

When it stops and asks you

  • Paddocks may be too wet to carry haul-outs even after the rain stops
  • The round order has changed since the last mill report
  • A block has no recent CCS figure

How often

A few times most crushes, more in a wet spring

Who uses it

OwnersManagers

What it uses

Live

Weather forecast

The team uses the forecast to find spray windows, warn you about heat and frost, and plan for dry spells.

Live

Inbound email

Forward invoices, kill sheets, NVDs, soil tests and emails from your stock agent to your own farm address. The team reads each one, sums it up and suggests who handles it.

Exploring

Fire, flood and heat warnings

If we get access, the team would see the same warnings you do and check your plan against them.

Live

Photos, PDFs and spreadsheets

Send in scale exports, scan results, soil tests, old spreadsheets or a photo of the shed whiteboard, and they become records.

The last 2 make it better, but it works without them.

Nothing official leaves the farm without your yes.This job runs at Recommend: suggests an action. You do it. You can change that any time.

See the guardrails

The conversation

How the job plays out, step by step.

Cane harvest liaison

Started 5:40am · Daily

Start to done
6 min
Agent actions
5
Needed you
2×
[AGENT NAME]For the Cane harvest liaison

Daily check · 5:40am

60 to 90 mm forecast over 3 days from Wednesday

Cane harvest liaison

Pulled the blocks left to cut, CCS and deliveries

60 to 90 mm forecast from Wednesday. If paddocks need 2 dry days after, that’s about 5 cutting days lost. You’ve 3,200 t of allocation left and 9 blocks, about 3,100 t. Blocks 7 and 11 have the best CCS and are next in the round. Want a note for the group meeting?

[AGENT NAME] · 5:40am

Yes. Put in that Block 9 is plant cane and was too wet last year too.

You · 5:42am

Cane harvest liaison

Drafted the note with the blocks, tonnes, CCS and Block 9 history

Note’s ready: blocks left in round order, tonnes, CCS, 5 days likely lost and a line on Block 9. Want it ready for you to forward to the group?

[AGENT NAME] · 5:42am

Approved

Yep, I’ll forward it.

You · 5:45am

Done · 5:45am4 saved

  • Blocks still to cut with tonnes and CCS trendSaved
  • How many cutting days the rain is likely to costSaved
  • Allocation still to fill and what that means for the end of crushSaved
  • A short note to take to the harvest groupSaved

Behind the scenes

  1. 5:40am

    Trigger Daily check

    60 to 90 mm forecast over 3 days from Wednesday

    • forecast.read60 to 90 mm, 3 days
  2. 5:40am+13 sec

    Cane harvest liaison works on it · 3 steps

    Pulled the blocks left to cut, CCS and deliveries

    • records.search9 blocks left, about 3,100 t
    • Deliveries 6,400 t of 9,600 t allocation
    • Blocks 7 and 11 CCS rising, 13.8 and 14.2
  3. 5:40am+2 sec

    [AGENT NAME] messages you

    “60 to 90 mm forecast from Wednesday. If paddocks need 2 dry days after, that’s about 5 cutting days lost. You’ve 3,200 t of allocation left and 9 blocks, about 3,100 t. Blocks 7 and 11 have the best CCS and are next in the round. Want a note for the group meeting?”

  4. 5:42am+3 min

    You reply

    “Yes. Put in that Block 9 is plant cane and was too wet last year too.”

  5. 5:42am+10 sec

    Cane harvest liaison works on it · 2 steps

    Drafted the note with the blocks, tonnes, CCS and Block 9 history

    • memory.rememberBlock 9 wet last season
    • reports.draftharvest group note
  6. 5:42am+2 sec

    [AGENT NAME] asks for your yes

    “Note’s ready: blocks left in round order, tonnes, CCS, 5 days likely lost and a line on Block 9. Want it ready for you to forward to the group?”

  7. 5:45am+3 min

    You approve

    “Yep, I’ll forward it.”

  8. 5:45am+3 sec

    Cane harvest liaison Done

    Harvest group note drafted for you to forward; blocks left and allocation tally set out; rain total to go on once it falls

    • Ready to add to your records: rain stoppage [date]

An example with made-up data. Names and figures in [brackets] are placeholders.

Put [AGENT NAME] to work on your farm.

We’re taking a small number of pilot farms in [REGION]. Start with one or two agents and add more as you go.

Pilot farms wanted

Want to try it out?

Join the pilot, or book a demo and we’ll walk you through this job on a farm like yours. You text the team from your phone. Some connections are still being built, and we’ll tell you which.

  • Weather forecast
  • Inbound email
  • Fire, flood and heat warnings
  • Nothing to install

Free report

Getting started with AI.

A free practical guide for Australian farms and agribusinesses

Where AI actually helps on a farm, what it needs from you, the risks to watch, and a 90-day plan to start small.

  • Where it actually helps
  • What it needs from you
  • Risks and guardrails
  • Working out the return
Book a demoJoin the pilot