Work out the materials for a new fence line
Fences get ordered from a guess, so you’re a roll of ringlock short on the day the fencer is there, or you pay for a pallet of steel posts you didn’t need.
The Infrastructure keeper works out posts, strainers, wire and stays from the length, fence type and corners, then drafts a materials list and a quote request for the rural store and fencer.
- When · On demand
- “We’re putting a new fence between 7 and 8, about 1.4 km, ringlock and two barbs”
- You get
- Materials list by item and quantity; drafted quote requests; fence job raised
- Approval level
- Act and tell. Does it and logs it. You hear about it after. You can change it.
What it reads
- Fence length and line from the farm map
- Fence type and post spacing the farm uses
- Corners, gateways and creek crossings on the line
- Contacts: rural store and fencer
What you get
- Materials list: strainers, stays, steel posts, ringlock rolls, barb rolls, gates
- A quote request for the rural store, ready to send
- A fence job raised with the line marked
When it stops and asks you
- The line crosses a creek or a boundary
- Post spacing isn’t on file
- It isn’t clear whether a gateway is wanted and where
How often
Whenever a new fence or a full replacement is planned
Who uses it
OwnersManagers
On other farms
- Goats: Uses closer post spacing and an extra offset electric wire, so the list grows.
What it uses
SMS and voice notes
Text the team, send a voice note or a photo, or forward a message. There’s no new app to learn.
Inbound email
Forward invoices, kill sheets, NVDs, soil tests and emails from your stock agent to your own farm address. The team reads each one, sums it up and suggests who handles it.
FarmMap4D
Your property map, paddocks and infrastructure would come in, with pasture and ground cover over time.
The last one makes it better, but it works without it.
Nothing official leaves the farm without your yes.This job runs at Act and tell: does it and logs it. You hear about it after. You can change that any time.
The conversation
How the job plays out, step by step.
Infrastructure keeper
Started 7:12am · On demand
- Start to done
- 6 min
- Agent actions
- 5
- Needed you
- 3×
[AGENT NAME]For the Infrastructure keeperWe’re putting a new fence between 7 and 8, about 1.4 km, ringlock and two barbs. What do we need?
You · 7:12am

Infrastructure keeper
Measured the line on the map and checked for corners and gateways

Line’s 1.42 km with one bend. Do you want a gateway in it, and where?
[AGENT NAME] · 7:12am
One gate near the trough at the north end.
You · 7:14am

Infrastructure keeper
Worked out the materials and drafted the quote request

Here’s the list: 6 strainer assemblies, 284 steel posts, 8 rolls of ringlock, 6 rolls of barb and a 3.6 m gate. The fence job’s raised. Send the quote request to [rural store]?
[AGENT NAME] · 7:14am
Send it, and get [fencer] a copy too.
You · 7:17am
Done · 7:17am1 waiting for you
- Materials list: strainers, stays, steel posts, ringlock rolls, barb rolls, gatesSaved
- A quote request for the rural store, ready to sendWaiting for you
- A fence job raised with the line markedSaved
Behind the scenes
7:12am
You ask
“We’re putting a new fence between 7 and 8, about 1.4 km, ringlock and two barbs. What do we need?”
7:12am+10 sec
Infrastructure keeper works on it · 2 steps
Measured the line on the map and checked for corners and gateways
records.searchfarm map, line 1.42 km, one bend, no creekmemory.rememberfarm uses 5 m steel post spacing
7:12am+2 sec
[AGENT NAME] messages you
“Line’s 1.42 km with one bend. Do you want a gateway in it, and where?”
7:14am+3 min
You reply
“One gate near the trough at the north end.”
7:14am+13 sec
Infrastructure keeper works on it · 3 steps
Worked out the materials and drafted the quote request
- 6 strainer assemblies, 284 steel posts, 8 rolls ringlock, 6 rolls barb, one 3.6 m gate
jobs.createfence between 7 and 8, line and gate markedreports.draftquote request for [rural store]
7:14am+2 sec
[AGENT NAME] messages you
“Here’s the list: 6 strainer assemblies, 284 steel posts, 8 rolls of ringlock, 6 rolls of barb and a 3.6 m gate. The fence job’s raised. Send the quote request to [rural store]?”
7:17am+3 min
You reply
“Send it, and get [fencer] a copy too.”
7:17am+3 sec
Infrastructure keeper Done
Quote request sent to [rural store] and copied to [fencer]; fence job raised with the line and gate marked
An example with made-up data. Names and figures in [brackets] are placeholders.
The agent behind it
Infrastructure keeperOperationsThe Infrastructure keeper looks after the fixed things: fences, yards, sheds, roads, tanks, bores and dams.
What it won’t do
- Book a contractor without asking first
- Sign off that a structure is safe
- Close a repair job nobody has done
More jobs the Infrastructure keeper does.
- A monthly list of repairs still openScheduled
- Flag when the bore pumps are due a checkDaily
- Get the yards fixed before weaning dayScheduled
- Check the creek crossings after the water comes upDaily
- Have the shearing shed ready before the team arrivesScheduled
- Find the fault when the electric fence drops below 4 kVDaily
Put [AGENT NAME] to work on your farm.
We’re taking a small number of pilot farms in [REGION]. Start with one or two agents and add more as you go.
See it on a farm like yours.
30 minutes with Thomas, our founder, on records like your own.
Livestock, paddocks, visitors and tanks, in one place.
The farm management software comes with every plan. Keep the software you already use, or use ours.
Not ready yet? Start with a free calculator.
The sums you do every week, for stock, pasture, crops and the books. No sign-up.
Watch a job before you commit.
Pick a playbook and see it play out, step by step.


