Have the shearing shed ready before the team arrives
Contractors walk off or charge for lost time when the handpieces trip the power, the grates are broken or the quarters have no hot water. A lot of it was noted last shearing and never fixed.
The Infrastructure keeper runs through the shed checklist, from board and grates to lights, catching pen gates, toilets and quarters and raises a job for everything that’s not right.
- When · Scheduled
- Four weeks before the shearing start date
- You get
- Shed checklist with what’s done and what isn’t; repair jobs raised; electrician request drafted if power is a problem
- Approval level
- Act and tell. Does it and logs it. You hear about it after. You can change it.
What it reads
- Notes from last shearing: shearer and contractor complaints
- Open repair jobs on the shed and quarters
- Shearing start date and team size from the contractor
- Photos sent during the walk-through
What you get
- The shed checklist with each item ticked or flagged
- Repair jobs for the grates, pen gates and lights
- A drafted request to the electrician for the plant and power points
When it stops and asks you
- A wiring fault or tripping power is reported: that’s for a licensed electrician
- The team size is bigger than the quarters sleep
- Last year’s complaints aren’t on file
How often
Before every shearing
Who uses it
OwnersManagersFarm staff
On other farms
- Goats: Mohair and cashmere clips add clean bins and separate fleece bags to the list.
What it uses
SMS and voice notes
Text the team, send a voice note or a photo, or forward a message. There’s no new app to learn.
Google and Outlook calendars
Once it’s connected, scanning, shearing, contractor and audit dates will appear on the calendar you already use.
Photos, PDFs and spreadsheets
Send in scale exports, scan results, soil tests, old spreadsheets or a photo of the shed whiteboard, and they become records.
The last 2 make it better, but it works without them.
Nothing official leaves the farm without your yes.This job runs at Act and tell: does it and logs it. You hear about it after. You can change that any time.
The conversation
How the job plays out, step by step.
Infrastructure keeper
Started 6:00am · Scheduled
- Start to done
- 8 min
- Agent actions
- 4
- Needed you
- 2×
[AGENT NAME]For the Infrastructure keeperOn schedule · 6:00am
Shearing starts [date], four weeks out, with a 4-stand team

Infrastructure keeper
Pulled last shearing’s notes and the shed jobs still open

Shearing’s 4 weeks away. From last time: stand 3 kept tripping, two grates are still broken, and the quarters’ hot water was slow. Can someone send photos of the board and the quarters?
[AGENT NAME] · 6:00am
Grates still broken. Hot water’s fine, new element went in. Haven’t tried the plant yet.
Staff · 6:05am

Infrastructure keeper
Updated the checklist and raised the jobs

The tripping on stand 3 needs [electrician] to look at it before the team arrives. Want me to draft the request for the week of [date]?
[AGENT NAME] · 6:05am
Yes, do it. He did the solar so he knows the board.
You · 6:07am
Done · 6:07am1 waiting for you
- The shed checklist with each item ticked or flaggedSaved
- Repair jobs for the grates, pen gates and lightsSaved
- A drafted request to the electrician for the plant and power pointsWaiting for you
Behind the scenes
6:00am
Trigger On schedule
Shearing starts [date], four weeks out, with a 4-stand team
jobs.read_upcomingshearing, 4 stands, 3,200 head
6:00am+10 sec
Infrastructure keeper works on it · 2 steps
Pulled last shearing’s notes and the shed jobs still open
records.searchstand 3 handpiece kept tripping; two broken grates; quarters hot water slow- Jobs: grates logged in [month], still open
6:00am+2 sec
[AGENT NAME] messages you
“Shearing’s 4 weeks away. From last time: stand 3 kept tripping, two grates are still broken, and the quarters’ hot water was slow. Can someone send photos of the board and the quarters?”
6:05am+5 min
Staff replies
“Grates still broken. Hot water’s fine, new element went in. Haven’t tried the plant yet.”
6:05am+10 sec
Infrastructure keeper works on it · 2 steps
Updated the checklist and raised the jobs
jobs.updatehot water donejobs.createreplace two grates, test all stands
6:05am+2 sec
[AGENT NAME] messages you
“The tripping on stand 3 needs [electrician] to look at it before the team arrives. Want me to draft the request for the week of [date]?”
6:07am+3 min
You reply
“Yes, do it. He did the solar so he knows the board.”
6:07am+3 sec
Infrastructure keeper Done
Electrician request drafted for stand 3; grate replacement and plant test on the jobs list; shed checklist shared with the manager
An example with made-up data. Names and figures in [brackets] are placeholders.
The agent behind it
Infrastructure keeperOperationsThe Infrastructure keeper looks after the fixed things: fences, yards, sheds, roads, tanks, bores and dams.
What it won’t do
- Book a contractor without asking first
- Sign off that a structure is safe
- Close a repair job nobody has done
More jobs the Infrastructure keeper does.
- A monthly list of repairs still openScheduled
- Flag when the bore pumps are due a checkDaily
- Get the yards fixed before weaning dayScheduled
- Check the creek crossings after the water comes upDaily
- Work out the materials for a new fence lineOn demand
- Find the fault when the electric fence drops below 4 kVDaily
Put [AGENT NAME] to work on your farm.
We’re taking a small number of pilot farms in [REGION]. Start with one or two agents and add more as you go.
See it on a farm like yours.
30 minutes with Thomas, our founder, on records like your own.
Livestock, paddocks, visitors and tanks, in one place.
The farm management software comes with every plan. Keep the software you already use, or use ours.
Not ready yet? Start with a free calculator.
The sums you do every week, for stock, pasture, crops and the books. No sign-up.
Watch a job before you commit.
Pick a playbook and see it play out, step by step.