Skip to content
Agentic Ag

Work out how many tonnes are in the silage pit

A guess at what’s in the pit sets how long the feed lasts through winter. A wrong guess by 100 t either has you buying hay at the worst time or carrying silage you didn’t need to make.

The Hay and silage planner works out the volume and likely tonnes of silage from the pit or stack measurements and the feed test, then updates feed on hand.

When · On demand
“Pit’s 40 m long, 9 m wide, about 2.2 m high. How much is in it?”
You get
Volume in cubic metres; tonnes as fed and dry matter, with the density assumption stated; feed on hand updated
Approval level
Act with approval. Prepares it fully. You tap yes. You can change it.
Useful for
DairyBeefFeedlotsMixed

What it reads

  • Measurements from the farmer: length, width, height, wall shape
  • Feed test: dry matter percentage
  • Records of loads carted into the pit at harvest

What you get

  • Pit volume and tonnes as fed
  • Tonnes of dry matter, using the feed test
  • Feed on hand updated so the feed budget uses the new figure

When it stops and asks you

  • The stack is a drive-over pile and the sides aren’t straight
  • No feed test is on file for that pit
  • The tonnes are well off the loads carted in at making

How often

After each pit or stack is made, and again when it’s opened

Who uses it

OwnersManagersFarm staff

On other farms

  • Feedlots: Feedlots also record the tonnes fed out each day, so it tracks the face moving back against the starting tonnes.

What it uses

Live

SMS and voice notes

Text the team, send a voice note or a photo, or forward a message. There’s no new app to learn.

Live

Photos, PDFs and spreadsheets

Send in scale exports, scan results, soil tests, old spreadsheets or a photo of the shed whiteboard, and they become records.

The last one makes it better, but it works without it.

Nothing official leaves the farm without your yes.This job runs at Act with approval: prepares it fully. You tap yes. You can change that any time.

See the guardrails

The conversation

How the job plays out, step by step.

Hay and silage planner

Started 7:12am · On demand

Start to done
6 min
Agent actions
5
Needed you
3×
[AGENT NAME]For the Hay and silage planner

Pit’s 40 m long, 9 m wide, about 2.2 m high. How much is in it?

You · 7:12am

Is that the bunker by the dairy with the concrete walls, or the drive-over stack in the bottom paddock?

[AGENT NAME] · 7:12am

Bunker by the dairy. Ryegrass from October.

You · 7:14am

Hay and silage planner

Worked out the volume and tonnes from the measurements and the October feed test

About 792 m³. At a typical rolled density that’s roughly [tonnes] t as fed, or [tonnes] t of dry matter at 34% DM. Carting records had 61 loads in, which is in the same ballpark. Put it on feed on hand?

[AGENT NAME] · 7:14am

Approved

Yep.

You · 7:17am

Hay and silage planner

Updated feed on hand and noted the density used

Done · 7:17am3 saved

  • Pit volume and tonnes as fedSaved
  • Tonnes of dry matter, using the feed testSaved
  • Feed on hand updated so the feed budget uses the new figureSaved

Behind the scenes

  1. 7:12am

    You ask

    “Pit’s 40 m long, 9 m wide, about 2.2 m high. How much is in it?”

  2. 7:12am+2 sec

    [AGENT NAME] messages you

    “Is that the bunker by the dairy with the concrete walls, or the drive-over stack in the bottom paddock?”

  3. 7:14am+3 min

    You reply

    “Bunker by the dairy. Ryegrass from October.”

  4. 7:14am+13 sec

    Hay and silage planner works on it · 3 steps

    Worked out the volume and tonnes from the measurements and the October feed test

    • 792 m³
    • Feed test [date]: 34% DM
    • Density assumption [density] for well-rolled bunker silage
  5. 7:14am+2 sec

    [AGENT NAME] asks for your yes

    “About 792 m³. At a typical rolled density that’s roughly [tonnes] t as fed, or [tonnes] t of dry matter at 34% DM. Carting records had 61 loads in, which is in the same ballpark. Put it on feed on hand?”

  6. 7:17am+3 min

    You approve

    “Yep.”

  7. 7:17am+10 sec

    Hay and silage planner works on it · 2 steps

    Updated feed on hand and noted the density used

    • inventory.updateDairy bunker, ryegrass silage
    • memory.rememberdensity assumption for this pit
  8. 7:17am+3 sec

    Hay and silage planner Done

    Dairy bunker recorded with volume, tonnes as fed and dry matter; feed planner’s budget now uses the new figure

An example with made-up data. Names and figures in [brackets] are placeholders.

The agent behind it

Hay and silage plannerCropping

The Hay and silage planner finds the cutting windows from the forecast, and keeps bale counts and feed tests by paddock and cut.

What it won’t do

  • Book a contractor without asking first
  • Promise a dry window the forecast doesn’t show
  • Make up bale counts

More jobs the Hay and silage planner does.

Put [AGENT NAME] to work on your farm.

We’re taking a small number of pilot farms in [REGION]. Start with one or two agents and add more as you go.

Pilot farms wanted

Want to try it out?

Join the pilot, or book a demo and we’ll walk you through this job on a farm like yours. You text the team from your phone. Some connections are still being built, and we’ll tell you which.

  • SMS and voice notes
  • Photos, PDFs and spreadsheets
  • Nothing to install

Free report

Getting started with AI.

A free practical guide for Australian farms and agribusinesses

Where AI actually helps on a farm, what it needs from you, the risks to watch, and a 90-day plan to start small.

  • Where it actually helps
  • What it needs from you
  • Risks and guardrails
  • Working out the return
Book a demoJoin the pilot