Skip to content
Agentic Ag

Catch a pump still running when peak power starts

A timer knocked out by a power cut, or a set started late, runs straight into peak, and nobody knows until the bill comes a month later. By then it’s happened twenty times.

The Pump and channel watcher reads the flow meters on every pump at the start of peak, matches any still moving water to the watering job behind it, works out what the peak hours will cost and puts a timer fix on the list after your yes.

When · Scheduled
Each weekday at the start of your peak tariff window, [time]
You get
Pumps running into peak, with the job behind each; what the extra peak hours cost; a job to reset the timer
Approval level
Act with approval. Prepares it fully. You tap yes. You can change it.
Useful for
Irrigated cropsOrchards and vinesDairy

What it reads

  • Monitoring: the flow meter on each pump, last 12 hours
  • Job list: today’s watering jobs, with start times and hours
  • Your tariff: peak and off-peak times and rates
  • Each pump’s power rating

What you get

  • Any pump still moving water at the start of peak
  • The watering job behind it and when it’ll finish
  • What the peak hours cost against running off-peak
  • A job to reset the timer before tonight

When it stops and asks you

  • A pump is running with no watering job behind it
  • The block it’s on can’t wait until tonight
  • A flow meter has no reading since this morning

How often

Every weekday in the irrigation season

Who uses it

ManagersFarm staff

What it uses

Partner

Water monitors and weather stations

Trough, tank and rain gauge readings would start jobs for the team.

Live

SMS and voice notes

Text the team, send a voice note or a photo, or forward a message. There’s no new app to learn.

The last one makes it better, but it works without it.

Nothing official leaves the farm without your yes.This job runs at Act with approval: prepares it fully. You tap yes. You can change that any time.

See the guardrails

The conversation

How the job plays out, step by step.

Pump and channel watcher

Started 6:00am · Scheduled

Start to done
5 min
Agent actions
4
Needed you
2×
[AGENT NAME]For the Pump and channel watcher

On schedule · 6:00am

Start of peak power on a weekday

Pump and channel watcher

Read every pump’s flow meter and matched it to the day’s jobs

Pump 2 is still running into peak. Its flow meter shows it started at 11:40 this morning, not 10 pm last night like the Block 6 job had it. With 10 hours to run it goes till about 9:40 tonight, about 6 hours of it in peak. At your rates that’s about [amount] more than overnight. I can’t stop it from here. Did the timer get knocked out?

[AGENT NAME] · 6:00am

Power went off overnight. Block 6 is gasping, let it run. Timer needs resetting though.

You · 6:02am

I’ll put a job on [irrigator]’s list to reset Pump 2’s timer to the 10 pm start before tonight. OK?

[AGENT NAME] · 6:02am

Approved

Yep.

You · 6:05am

Pump and channel watcher

Added the job

Done · 6:05am4 saved

  • Any pump still moving water at the start of peakSaved
  • The watering job behind it and when it’ll finishSaved
  • What the peak hours cost against running off-peakSaved
  • A job to reset the timer before tonightSaved

Behind the scenes

  1. 6:00am

    Trigger On schedule

    Start of peak power on a weekday

    • Schedule: weekdays at [time], the start of peak
  2. 6:00am+13 sec

    Pump and channel watcher works on it · 3 steps

    Read every pump’s flow meter and matched it to the day’s jobs

    • sensors.read_waterPump 2 at 68 L/s since 11:40 am, nothing overnight; river pump and Pump 3 stopped at 6 am
    • records.searchjob, Water Block 6 for 10 hours from 10 pm last night, [irrigator]
    • Pump 2: 45 kW
  3. 6:00am+2 sec

    [AGENT NAME] messages you

    “Pump 2 is still running into peak. Its flow meter shows it started at 11:40 this morning, not 10 pm last night like the Block 6 job had it. With 10 hours to run it goes till about 9:40 tonight, about 6 hours of it in peak. At your rates that’s about [amount] more than overnight. I can’t stop it from here. Did the timer get knocked out?”

  4. 6:02am+3 min

    You reply

    “Power went off overnight. Block 6 is gasping, let it run. Timer needs resetting though.”

  5. 6:02am+2 sec

    [AGENT NAME] asks for your yes

    “I’ll put a job on [irrigator]’s list to reset Pump 2’s timer to the 10 pm start before tonight. OK?”

  6. 6:05am+3 min

    You approve

    “Yep.”

  7. 6:05am+7 sec

    Pump and channel watcher works on it · 1 step

    Added the job

    • jobs.createReset Pump 2 timer to a 10 pm start, today, [irrigator]
  8. 6:05am+3 sec

    Pump and channel watcher Done

    Pump 2’s run into peak noted with what it cost; the timer reset on [irrigator]’s list for today; every pump checked again at tomorrow’s peak start

    • reports.draftPump 2 ran about 6 hours into peak, [date], after a power cut

An example with made-up data. Names and figures in [brackets] are placeholders.

The farm software this job works from

Put [AGENT NAME] to work on your farm.

We’re taking a small number of pilot farms in [REGION]. Start with one or two agents and add more as you go.

Pilot farms wanted

Want to try it out?

Join the pilot, or book a demo and we’ll walk you through this job on a farm like yours. You text the team from your phone. Some connections are still being built, and we’ll tell you which.

  • Water monitors and weather stations
  • SMS and voice notes
  • Nothing to install

Free report

Getting started with AI.

A free practical guide for Australian farms and agribusinesses

Where AI actually helps on a farm, what it needs from you, the risks to watch, and a 90-day plan to start small.

  • Where it actually helps
  • What it needs from you
  • Risks and guardrails
  • Working out the return
Book a demoJoin the pilot