Skip to content
Agentic Ag

Walk the channels before the first watering of the season

Weeds, silt, rabbit holes in the banks and gates that seized over winter all show up on the first watering, when water is backing up and the crop is waiting. A walk three weeks out gives time to fix them.

The Pump and channel watcher builds a channel and gate checklist from the map and last season’s repairs, drafts a text to staff for the walk and turns what they find into jobs.

When · Scheduled
Three weeks before the first water order of the season
You get
A checklist by channel section and gate; findings logged; repair and clearing jobs raised
Approval level
Act with approval. Prepares it fully. You tap yes. You can change it.
Useful for
Irrigated cropsDairy

What it reads

  • Channel map with sections, gates and drop boards
  • Last season’s repairs and problem spots
  • Weed control done over winter
  • Staff available

What you get

  • A checklist for each channel section
  • Findings logged with photos
  • Jobs for clearing, bank repair and gate fixes

When it stops and asks you

  • Work is needed on the authority’s supply channel
  • A finding needs a contractor with an excavator
  • The walk isn’t done a week before the first order

How often

Once a year before the season

Who uses it

ManagersFarm staff

What it uses

Live

SMS and voice notes

Text the team, send a voice note or a photo, or forward a message. There’s no new app to learn.

Live

Photos, PDFs and spreadsheets

Send in scale exports, scan results, soil tests, old spreadsheets or a photo of the shed whiteboard, and they become records.

Partner

FarmMap4D

Your property map, paddocks and infrastructure would come in, with pasture and ground cover over time.

The last 2 make it better, but it works without them.

Nothing official leaves the farm without your yes.This job runs at Act with approval: prepares it fully. You tap yes. You can change that any time.

See the guardrails

The conversation

How the job plays out, step by step.

Pump and channel watcher

Started 6:00am · Scheduled

Start to done
11 min
Agent actions
6
Needed you
3×
[AGENT NAME]For the Pump and channel watcher

On schedule · 6:00am

First water order expected [date], three weeks out

Pump and channel watcher

Built the checklist from the map and last season’s repairs

Channel walk checklist is ready: 8 sections, 23 gates, with last season’s problem spots marked. I’ve drafted a text to Mick and Raj for this week. Look right?

[AGENT NAME] · 6:00am

Approved

Yep, I’ll send it.

You · 6:02am

Done. Cumbungi back in 6. Rabbit holes in bank at Section 3 again. Gate 14 won’t lift.

Staff · 6:07am

Three jobs from that: clear Section 6, fill and compact the Section 3 bank, free Gate 14. Raise them?

[AGENT NAME] · 6:07am

Approved

Yep.

You · 6:10am

Pump and channel watcher

Logged the findings and raised the jobs

Done · 6:10am3 saved

  • A checklist for each channel sectionSaved
  • Findings logged with photosSaved
  • Jobs for clearing, bank repair and gate fixesSaved

Behind the scenes

  1. 6:00am

    Trigger On schedule

    First water order expected [date], three weeks out

    • records.searchseason start
  2. 6:00am+13 sec

    Pump and channel watcher works on it · 3 steps

    Built the checklist from the map and last season’s repairs

    • 8 sections, 23 gates
    • Last season: bank slump Section 3, Block 4 gate leak, cumbungi in Section 6
    • reports.draft
  3. 6:00am+2 sec

    [AGENT NAME] asks for your yes

    “Channel walk checklist is ready: 8 sections, 23 gates, with last season’s problem spots marked. I’ve drafted a text to Mick and Raj for this week. Look right?”

  4. 6:02am+3 min

    You approve

    “Yep, I’ll send it.”

  5. 6:07am+5 min

    Staff replies

    “Done. Cumbungi back in 6. Rabbit holes in bank at Section 3 again. Gate 14 won’t lift.”

  6. 6:07am+2 sec

    [AGENT NAME] asks for your yes

    “Three jobs from that: clear Section 6, fill and compact the Section 3 bank, free Gate 14. Raise them?”

  7. 6:10am+3 min

    You approve

    “Yep.”

  8. 6:10am+13 sec

    Pump and channel watcher works on it · 3 steps

    Logged the findings and raised the jobs

    • jobs.createclear Section 6
    • jobs.createfill and compact bank, Section 3
    • jobs.createfree Gate 14
  9. 6:10am+3 sec

    Pump and channel watcher Done

    Walk logged with three findings; three jobs raised before the first order; Section 3 noted for the rabbit controller

An example with made-up data. Names and figures in [brackets] are placeholders.

Put [AGENT NAME] to work on your farm.

We’re taking a small number of pilot farms in [REGION]. Start with one or two agents and add more as you go.

Pilot farms wanted

Want to try it out?

Join the pilot, or book a demo and we’ll walk you through this job on a farm like yours. You text the team from your phone. Some connections are still being built, and we’ll tell you which.

  • SMS and voice notes
  • Photos, PDFs and spreadsheets
  • FarmMap4D
  • Nothing to install

Free report

Getting started with AI.

A free practical guide for Australian farms and agribusinesses

Where AI actually helps on a farm, what it needs from you, the risks to watch, and a 90-day plan to start small.

  • Where it actually helps
  • What it needs from you
  • Risks and guardrails
  • Working out the return
Book a demoJoin the pilot